On Monday, March 19, construction will begin on the renovation of the Student Technology Resources Center (STRC) on the 4th floor of Langsam Library. A full-height, drywall construction barrier will be installed around the STRC area to minimize dust and noise throughout the project.
Beginning Monday, March 12, the Alienware Video Editing workstations located in the STRC, as well as the Disability Services workstations will be relocated temporarily to Langsam Library 461 to allow for the renovation of the STRC and the Disability Services Office. All other services will remain available in the current STRC space.
Assistance with Disability Services will be available on Monday-Friday from 9am-5pm via the Langsam Library Info Commons Desk on the 4th floor.
The expected completion date for this project is the end of July 2012.